It's a very physical job, particularly when you have to get through concrete which varies in thickness from 2" to about 14".
It couldn't have happened at a better time though.
Take bathroom apart to renew.
JO ruptures achillies tendon
Work stops on bathroom, no work no pay for a while.
Jo finds it awkward to get upstairs
Invite 30 people round for a day long barbecue
Downstairs toilet blocks
While trying to unblock you realise problem is worse as water is seeping up from the ground and blockage isn't moving
30 people want to use the toilet....... ok thank goodness for Farmer Joe's outside loo
JO has to go upstairs each time she wants the loo
She berates me like anything for not working fast enough
I eventually get through concrete
I find 3 broken clay sewer pipes
I find the fall is positive from both the loo and the basin/washing machine pipes before it then becomes negative
Nothing I have will do a temporary repair
Start digging up rest of the pipe so that I can take it all up and lay new which at least will fall from house to inspection chamber!
Still no work on the bathroom being done.
On the plus side that's two loos less for Abi to clean
And we've had an idea on changing the use of the bathroom, so it becomes an upstairs loo with sink and partioned off to become my office. Put 2nd en-suite in other bedroom and if we have a full house of guests one lot will have to use the downstairs shower room...... which I'm going to build now I'm doing the drains.
Really really should have had that kit kat..... at Least Jo's tendon is repairing, she now has a removable boot for walking in and has managed to walk upstairs rather than going on her bum and is currently back in London working, with my Mom as chaperone.
It couldn't have happened at a better time though.
Take bathroom apart to renew.
JO ruptures achillies tendon
Work stops on bathroom, no work no pay for a while.
Jo finds it awkward to get upstairs
Invite 30 people round for a day long barbecue
Downstairs toilet blocks
While trying to unblock you realise problem is worse as water is seeping up from the ground and blockage isn't moving
30 people want to use the toilet....... ok thank goodness for Farmer Joe's outside loo
JO has to go upstairs each time she wants the loo
She berates me like anything for not working fast enough
I eventually get through concrete
I find 3 broken clay sewer pipes
I find the fall is positive from both the loo and the basin/washing machine pipes before it then becomes negative
Nothing I have will do a temporary repair
Start digging up rest of the pipe so that I can take it all up and lay new which at least will fall from house to inspection chamber!
Still no work on the bathroom being done.
On the plus side that's two loos less for Abi to clean
And we've had an idea on changing the use of the bathroom, so it becomes an upstairs loo with sink and partioned off to become my office. Put 2nd en-suite in other bedroom and if we have a full house of guests one lot will have to use the downstairs shower room...... which I'm going to build now I'm doing the drains.