JoceAndChris
Member
- Messages
- 6,606
- Location
- Lincolnshire
I expect to be working on this through 2012 as it's a big project. I'm at the thinking through stage and I'm just trying to figure out how much of the room I need to pull out. Pics to follow - the most puzzling decision currently is whether to keep the concrete skirting and the plaster, or hack it out and see what I find.
This is what I mean by a Campaign Room, by the way - Empress Josephine liked them and so do I.
http://pambristow.com/2011/03/07/best-in-tent/
This is what I mean by a Campaign Room, by the way - Empress Josephine liked them and so do I.
http://pambristow.com/2011/03/07/best-in-tent/