discobarry
Member
- Messages
- 129
Hello all,
I have been trying to get quotes for lime pointing the whole of our house which is a small ish 3 bed farmers cottage. We had the first quote of a guy i really liked who was more than willing to talk about all aspects of the job and he was enthusiastic but his quote seemed to be nearer 5k. The second quote we got was off a guy who has a good website with examples off there work on, but i wasn't as keen on him as the other. As odd as it sounds i'm quite a good judge of character and the first guy i really preferred. The probably being the second quote was shy of 2k for all the works done in natural hydraulic lime all raked out with scaffolding the same as the first.
I don't get the difference, is 5k nearer the mark or is 2k? And should i trust my instincts? (even though my accountant wife trusts numbers more )
I have been trying to get quotes for lime pointing the whole of our house which is a small ish 3 bed farmers cottage. We had the first quote of a guy i really liked who was more than willing to talk about all aspects of the job and he was enthusiastic but his quote seemed to be nearer 5k. The second quote we got was off a guy who has a good website with examples off there work on, but i wasn't as keen on him as the other. As odd as it sounds i'm quite a good judge of character and the first guy i really preferred. The probably being the second quote was shy of 2k for all the works done in natural hydraulic lime all raked out with scaffolding the same as the first.
I don't get the difference, is 5k nearer the mark or is 2k? And should i trust my instincts? (even though my accountant wife trusts numbers more )