finally getting round to this , that was a long wait.
just pricing up materials.
so , have i got this straight then guys?
coarse coat is 3:1 sharp sand/lime putty with goats hair.
float coat is 5:3 or 3:2 sharp sand with or without hair? preferably with?
can i plaster a *plasterboard ceiling with this or will i need to key it with something first? ,
*i know its wrong but it would have to meet fire regs , i wanted to use reed but would need such a thick layer or plaster to compensate i would probably be loosing all my head room. :shock:
just pricing up materials.
so , have i got this straight then guys?
coarse coat is 3:1 sharp sand/lime putty with goats hair.
float coat is 5:3 or 3:2 sharp sand with or without hair? preferably with?
can i plaster a *plasterboard ceiling with this or will i need to key it with something first? ,
*i know its wrong but it would have to meet fire regs , i wanted to use reed but would need such a thick layer or plaster to compensate i would probably be loosing all my head room. :shock: