A reputable plumbing company in my area has advised me that to replace my existing ten year old combi boiler with a new condenser boiler will require upgrading the gas supply pipework from 22” to 28”.is this true? In my case it would require a run exceeding 50 ft and would cause considerable disruption with the removal of boxed in panels and floor board lifting let alone the cost of running 50 ft of 28” copper.