Ha, it’s a good line but I genuinely wish it had all been down to me, would have been a lot less stressful. It was much more fun (and a lot cheaper) renovating our entire previous property on my own than having to pay trades to do a sub par job on delivering this small one story extension.
2 and a half years wasted arguing with planning, then delays in the build due to an architect who didn’t believe in actually detailing drawings, and then “know it all” builders who lost interest once the building was water tight and they had to actually deliver the spec of interior and second fix which they assured me they were capable of during tender.
Since I finally managed to get rid of them, it’s been much better, I can deliver things to the standard my OCD demands, it’s gone faster because things aren’t having to be done 3 times and it doesn’t cost me an body part every 30 days!
2 and a half years wasted arguing with planning, then delays in the build due to an architect who didn’t believe in actually detailing drawings, and then “know it all” builders who lost interest once the building was water tight and they had to actually deliver the spec of interior and second fix which they assured me they were capable of during tender.
Since I finally managed to get rid of them, it’s been much better, I can deliver things to the standard my OCD demands, it’s gone faster because things aren’t having to be done 3 times and it doesn’t cost me an body part every 30 days!