vicky whitworth
Member
- Messages
- 632
- Location
- East Devon
Hello again, we need to have the outside of our rubble stone cottage re-pointed all over. The plan is to have the old pointing raked out (some is cement-based, and some is lime but has been done as ribbon pointing and looks awful) and the whole place re-pointed. Being rubble stone there will need to be some depth to the pointing as there are large gaps and voids in the rubble stone.
We live in East Devon and down a sheltered valley. It's wet and damp here but reasonably frost-free except last Winter when we had hard frosts from Christmas through to the Spring.
What do you think is the latest date we could start re-pointing, or if we leave it for this year, the earliest date we could start in the Spring. I want to be sure the lime doesn't crack, fall out or look a mess. I'm tempted to leave it now til next year and start it late April. What do you reckopn?
Thanks, Vicky
We live in East Devon and down a sheltered valley. It's wet and damp here but reasonably frost-free except last Winter when we had hard frosts from Christmas through to the Spring.
What do you think is the latest date we could start re-pointing, or if we leave it for this year, the earliest date we could start in the Spring. I want to be sure the lime doesn't crack, fall out or look a mess. I'm tempted to leave it now til next year and start it late April. What do you reckopn?
Thanks, Vicky