Hi all,
Going thorugh our project planning for the renovation and trying to deiced whats necesary and whats a load of b******** based on surveyors reports etc.
We were told that we needed to insert lateral wall ties in between the outer walls and the party walls because there was some evidnece of splitting of wallpaper and gaps in skirting board at corners.
The building dates from 1846, the outer walls are solid stone, the party walls are solid brick inserted in victorian era when the mill was divided up into houses. There are no internal loadbearing walls just a beam from front wall to back on the ground floor and nothing on 1st and second floor.
Now from a bit of readign around I've done wall ties are for cavity walls, so I'm a little confused as to how you would put them into this house and also wodnering if they are needed? I guess my instinct is that if a house has stood for over 150 years with no huge cracks or bits falling off then its a pretty sound structure. On the other hand if the thing about wall ties is needed I want it done now whilst we are still at first fix stage of the renovation.
What should my next step be?
Going thorugh our project planning for the renovation and trying to deiced whats necesary and whats a load of b******** based on surveyors reports etc.
We were told that we needed to insert lateral wall ties in between the outer walls and the party walls because there was some evidnece of splitting of wallpaper and gaps in skirting board at corners.
The building dates from 1846, the outer walls are solid stone, the party walls are solid brick inserted in victorian era when the mill was divided up into houses. There are no internal loadbearing walls just a beam from front wall to back on the ground floor and nothing on 1st and second floor.
Now from a bit of readign around I've done wall ties are for cavity walls, so I'm a little confused as to how you would put them into this house and also wodnering if they are needed? I guess my instinct is that if a house has stood for over 150 years with no huge cracks or bits falling off then its a pretty sound structure. On the other hand if the thing about wall ties is needed I want it done now whilst we are still at first fix stage of the renovation.
What should my next step be?