paulb33
Member
- Messages
- 582
- Location
- Penarth, Vale of Glamorgan
Hi All,
Its been a while since my last update. Most of the time has been spent applying 9 coats of lime wash to roughcast render on two large elevations. A herculean job that I wouldn't wish upon my worst enemy. No contractor would touch it. The white didn't look right, so its turned brown. The lime wash was colour matched from Masons Mortars. Also, the final coat of linseed oil on the windows was applied just before a tropical downpour. So, that took weeks to clean up and redo. Anyway, I'm almost there now. Just the topcoat of roughcast on the balcony to go (and lime wash.... ). Scaffold should be down within the week.
Paul
Its been a while since my last update. Most of the time has been spent applying 9 coats of lime wash to roughcast render on two large elevations. A herculean job that I wouldn't wish upon my worst enemy. No contractor would touch it. The white didn't look right, so its turned brown. The lime wash was colour matched from Masons Mortars. Also, the final coat of linseed oil on the windows was applied just before a tropical downpour. So, that took weeks to clean up and redo. Anyway, I'm almost there now. Just the topcoat of roughcast on the balcony to go (and lime wash.... ). Scaffold should be down within the week.
Paul