I have just ordered wet ufh for my upstairs bathroom which I intend to finish with travertine tiles but I am unsure how to install it. Bearing in mind that I don't want to raise the floor too much I thought about screwing 15-22mm exterior grade ply to the underside of the joists every 400mm or so, filling the void with celotex or equivalent up to the top of the joists, laying the pipe onto the insulation and covering with a dry sand/lime mix to a depth of perhaps 50mm before laying the limestone tiles. The room is 4.3 X 3.3M, the joists are 7 X 3" spaced 6" apart and they run across the 3.3M length. Does this sound reasonable? Any comments/advice would be gratefully received.