We've just had the survey completed on the Grade II cottage that we fell in love with and are still hoping to buy. My partner has renovated dilapidated properties in the past, we've both lived in various 'historical treasures' and are aware that buying a listed property is not going to be problem-free.
We put in an offer (cash buyers) which was accepted by the vendors prior to the survey on the basis that they want a 'quick completion'. The survey threw up a lot of problems that we weren't expecting and the vendors unrealistically are still pushing for us to complete within the four week period from the date we made our offer on the property, with their desired date for completion being 11th December...which is, quite frankly, putting us under unnecessary stress. The property is empty and being sold by executors of the now deceased owner so there isn't even the problem of it being sold in a chain.
Two of the many unexpected issues thrown up by the survey are as below.
1. Rafters and roof structure above main bedroom and bathroom needs immediate replacement - death watch beetle damage has caused cracked pole rafters which need replacing. Horizontal bearers and longitudinal beam at ceiling level need to be replaced, the latter by an RSJ (with associated problems of access to roof space). Battens have given way and thatch is in danger of falling into roof space. In much of the roof the horizontal willow battens are thin and worn and should be replaced. Middle roof structure - no access hatch available but is expected to be in similar condition. In one bedroom a cross truss is visible and supported on a window frame, needs replacing or restructuring? The thatch is currently being replaced at the rear of the property, paid for by the vendors due to there being so little interest in the property during the year it has been on the market - we cannot understand why the thatch is being put on top of the cracked poles and worn battens - is this usual practice?! The thatch to the front of the property needs shaving and patch repairs and the ridge over the garage addition needs replacing. Added to this is the issue raised that none of the electrical wiring in the roof space is armour protected so this would also require our attention.
2. Dining room chimney flue is not lined and needs to be, as there are significant tar stains on the chimney stack in the roof space. The register plate is set too low against the bresummer beam with significant tar deposits built up on top of it. The woodburner needs replacing as it is too large for the flue. External ventilation to the fire place is required. The thing that most worried us about the external chimney stack is that it is 1.1 metres high but our surveyor told us it should be 1.8 metres high. All these issues contribute to a high risk of a chimney fire and thatch fire, and he recommends that these issues should be rectified as a matter of urgency. He pointed out that there may be a problem with raising the stack height as it is a listed building in a conservation area.
We knew we'd be sinking a vast amount of time and money into the property but these two sets of issues weren't expected (along with a handful of other 'issues' requiring money and attention). Our surveyor advised us to obtain formal quotes for this work to be carried out plus a specialist wood survey on floors as they may require treatment due to evidence in beams of historic beetle attack prior to going further with legal aspects of the purchase.
Is there anyone here who has dealt with similar problems? Was it as expensive to deal with as it sounds? All advice, stories of experiences, pointers and suchlike would be very gratefully received as I fear my heart is ruling my head and my partner is far more sensible as his head always wins out!
Help!!!
We put in an offer (cash buyers) which was accepted by the vendors prior to the survey on the basis that they want a 'quick completion'. The survey threw up a lot of problems that we weren't expecting and the vendors unrealistically are still pushing for us to complete within the four week period from the date we made our offer on the property, with their desired date for completion being 11th December...which is, quite frankly, putting us under unnecessary stress. The property is empty and being sold by executors of the now deceased owner so there isn't even the problem of it being sold in a chain.
Two of the many unexpected issues thrown up by the survey are as below.
1. Rafters and roof structure above main bedroom and bathroom needs immediate replacement - death watch beetle damage has caused cracked pole rafters which need replacing. Horizontal bearers and longitudinal beam at ceiling level need to be replaced, the latter by an RSJ (with associated problems of access to roof space). Battens have given way and thatch is in danger of falling into roof space. In much of the roof the horizontal willow battens are thin and worn and should be replaced. Middle roof structure - no access hatch available but is expected to be in similar condition. In one bedroom a cross truss is visible and supported on a window frame, needs replacing or restructuring? The thatch is currently being replaced at the rear of the property, paid for by the vendors due to there being so little interest in the property during the year it has been on the market - we cannot understand why the thatch is being put on top of the cracked poles and worn battens - is this usual practice?! The thatch to the front of the property needs shaving and patch repairs and the ridge over the garage addition needs replacing. Added to this is the issue raised that none of the electrical wiring in the roof space is armour protected so this would also require our attention.
2. Dining room chimney flue is not lined and needs to be, as there are significant tar stains on the chimney stack in the roof space. The register plate is set too low against the bresummer beam with significant tar deposits built up on top of it. The woodburner needs replacing as it is too large for the flue. External ventilation to the fire place is required. The thing that most worried us about the external chimney stack is that it is 1.1 metres high but our surveyor told us it should be 1.8 metres high. All these issues contribute to a high risk of a chimney fire and thatch fire, and he recommends that these issues should be rectified as a matter of urgency. He pointed out that there may be a problem with raising the stack height as it is a listed building in a conservation area.
We knew we'd be sinking a vast amount of time and money into the property but these two sets of issues weren't expected (along with a handful of other 'issues' requiring money and attention). Our surveyor advised us to obtain formal quotes for this work to be carried out plus a specialist wood survey on floors as they may require treatment due to evidence in beams of historic beetle attack prior to going further with legal aspects of the purchase.
Is there anyone here who has dealt with similar problems? Was it as expensive to deal with as it sounds? All advice, stories of experiences, pointers and suchlike would be very gratefully received as I fear my heart is ruling my head and my partner is far more sensible as his head always wins out!
Help!!!