Hi everyone, I have dug out the floor in my outbuilding as the wall has come down and an RSJ put in.
There was a downstairs loo and as you can see below its the old clay pipe. In the garden there is no inspection put for the soil pipe, everyone else has one.
My question is should I replace this will plastics and put in an inspection pit outside before putting the floor in?
I thought it might be a good idea as its earlier to get to now rather than later when the floor is down.
Way sort of tradesman does this plumber or ground worker or both?
Any thoughts
There was a downstairs loo and as you can see below its the old clay pipe. In the garden there is no inspection put for the soil pipe, everyone else has one.
My question is should I replace this will plastics and put in an inspection pit outside before putting the floor in?
I thought it might be a good idea as its earlier to get to now rather than later when the floor is down.
Way sort of tradesman does this plumber or ground worker or both?
Any thoughts