For general mortars the quicklime was then usually slaked to a crude powder (technically, a dry-hydrate) on site. One of the most popular methods to achieve this was to place a one-third measure of quicklime broken down to the size of nutmegs within a cubic yard of ringed sand, and then apply the minimum of water necessary to slake it, before quickly drawing the sand over it as it both heated and broke down in slaking. After slaking was completed the pile would be turned over dry to fully integrate the sand and lime. One option was then to add extra water to bring it to the working consistency of mortar ready for immediate use.