In anticipation of the granting of my LBC to remove the paint from our house, I am looking into the access. I have my own scaffold tower, but foresee a problem with the overhead electrical supply (which connects to a termination plate on the front of the house). Spoke with EDF and they told me it needs to be shrouded - The problem is that although this is free, there is no guarantee on timing (said it could take 10 weeks!).
Anyone else in Norfolk have experience of how long shrouding takes?
Anyone else in Norfolk have experience of how long shrouding takes?