lookseehear
Member
- Messages
- 6
- Location
- Somerset
We need to repoint our house (detached 5 bed, so not a small job) and I'm wondering about taking this on as a longer term DIY job. Ideally I'd go around removing all the old cementitious pointing first, then start the repointing with lime, but I'm not sure how much of a problem it would be if the joints were exposed in the meantime vs doing a small section, removing old pointing and repointing. I imagine that if anything it would allow the walls to remain dryer, but with some potential frosts to come before it gets warm, will leaving the joints exposed cause any damage?
Thanks in advance.
Thanks in advance.