Hi, this my first post here. My house has a cavity breeze block and stone extension built in the 60s, so I assume the original mortar would have been cement. I’ve just removed a horrible sand cement render from the stonework on the outside, not going to re render. I need to re point where it’s been pulled away with the render. Is there any point doing it with a hudraulic lime mix if the mortar the stone is bedded with is cement based? Bearing in mind its a cavity wall so damp inside is not an issue, but I do want to preserve the face of the stone if I can. Thanks