A
Anonymous
Guest
I have just uncovered the original floor pamments. They are currently below 3 inches of concrete. They are laid straight on the earth and my intention is to reuse them. The gound level externally is 3 inches above the floor pamments so i dont have a great deal of space to play with. externally is a french drain to reduce the moisture level, but due to non existant foundations i dont want to dig down and undermine then to put in a ground bearing slab. Are there any suggestions as to what to do with the floor, is it advisable just to leave them on the earth base or is there a 'breathable' construction i could place them on?