There is a good deal of lead being used on my oak frame extension. I heard that lead should not be in direct contact with oak as the oak produces acids and corrides the lead. On my building they seem to have nailed the lead to the oak in quite a few places and ignored the plans that show a membrance. Any advice on how serious a problem this really is? There does not seem to be a lot of info on the subject. Thanks.