plasticpigeon
Member
- Messages
- 2,462
- Location
- Birmingham
Following on from the woodworm post, and use of modern materials and methods, I have been thinking about leveling my kitchen floor and the best way to do it since I shall have to take all the quarry tiles up. My plan was to dig out the old lime mortar screed that has turned to sand, level the earth (it is about 50mm out of level at the mo) and lay a new screed of lime onto which I can lay the quarries. I don't really want to dig out tons of earth to put in limecrete, but I got thinking about insulation, and realise that even quite a thin sheet of expanded resin (celotex type stuff say 20mm) can offer significant insulation, so I was thinking about the idea of laying down some insulation boards first. To maintain breathability I was thinking I could perforate the expanded resin insulation with holes using a hole saw making it look a bit like a cheesegrater, and then fill the holes with a lime/perlite mix, which is also quite good at insulating but would be permeable, then lime screed over that and tiles on top. Daft?