masochists-r-us
Member
- Messages
- 262
- Location
- Northamptonshire
On the basis we have rejected the reclaimed York stone flags we had planned to install ( they looked like paving slabs), we decided to go for a suspended oak floor. However, our builder says the 5 inches depth we have is not enough to install one so recommends a new concrete screed with engineered boards on top (!!!!). Beacause the floor level has already been lowered by approx 6-8 " many years ago, we're not keen to risk undermining the foundations of our 17th C stone farmhouse by removing yet more.
Is there a way of achieving what we want with the 5" depth we have available ?
Is there a way of achieving what we want with the 5" depth we have available ?