benmc
Member
- Messages
- 129
- Location
- Hertfordshire
Hi All
When we bought our Church we were informed by the lady who originally converted it that the original tiles floor had been very damaged and was dug up and replaced with concrete!!
About 6 months ago I started work on this room in question and lifted the carpet. I was surprised to find a very small piece of tile showing through a thin concrete slurry. I have spent the last few months cleaning the 1mm layer of concrete slurry off the top of the tiles with brick acid. I am pleased to be able to say all is looking very good now.
Now coming onto my question.
There are 3 areas where I need to extend the existing pattern of tiles. I have found a suppler of the replacement tiles (http://www.cravendunnill-jackfield.co.uk/) not cheap but oh well.
Now to extend the pattern I need to dig out the existing floor and then relay.
My builder has started to dig the floor up and found the top inch of concrete comes up easily leaving a rough surface, 10mm up and down. Now I am wondering if it is possible to lay the tiles in a lime mortar, this would allow me to lay as originally laid and also take up the differences in levels without much trouble.
Any ideas?
Ben
When we bought our Church we were informed by the lady who originally converted it that the original tiles floor had been very damaged and was dug up and replaced with concrete!!
About 6 months ago I started work on this room in question and lifted the carpet. I was surprised to find a very small piece of tile showing through a thin concrete slurry. I have spent the last few months cleaning the 1mm layer of concrete slurry off the top of the tiles with brick acid. I am pleased to be able to say all is looking very good now.
Now coming onto my question.
There are 3 areas where I need to extend the existing pattern of tiles. I have found a suppler of the replacement tiles (http://www.cravendunnill-jackfield.co.uk/) not cheap but oh well.
Now to extend the pattern I need to dig out the existing floor and then relay.
My builder has started to dig the floor up and found the top inch of concrete comes up easily leaving a rough surface, 10mm up and down. Now I am wondering if it is possible to lay the tiles in a lime mortar, this would allow me to lay as originally laid and also take up the differences in levels without much trouble.
Any ideas?
Ben