Hey all,
How many days do you typically keep spraying your internal skim coats (specifically non-hydraulic lime based). The background suction is insane on my son's bedroom wall that we skim plastered 2 days ago, probably because it's got 5 CM thick of bone-dry insulating lime plaster backing coat behind it, and it's trying to turn white on me almost as fast as I can keep spraying it. I did wet the wall down thoroughly before we skimmed it but I guess it needed a couple rounds of spraying leading up to the time we skimmed it. Lesson learned for next time.
I'm spraying it down every day first thing in the morning and last thing in the evening, and sometimes in the middle of the day as well. I'm just wondering how long I should keep this up before letting it dry out and calling it good.
Thanks.
How many days do you typically keep spraying your internal skim coats (specifically non-hydraulic lime based). The background suction is insane on my son's bedroom wall that we skim plastered 2 days ago, probably because it's got 5 CM thick of bone-dry insulating lime plaster backing coat behind it, and it's trying to turn white on me almost as fast as I can keep spraying it. I did wet the wall down thoroughly before we skimmed it but I guess it needed a couple rounds of spraying leading up to the time we skimmed it. Lesson learned for next time.
I'm spraying it down every day first thing in the morning and last thing in the evening, and sometimes in the middle of the day as well. I'm just wondering how long I should keep this up before letting it dry out and calling it good.
Thanks.