plumbers mate
Member
- Messages
- 430
- Location
- Frozen north
Not really a period property topic but I don't want to join another forum to ask what is probably a simple question....
I have to get the chimney breast between the kitchen and scullery removed (no discussion, it's in the middle and creates two small, stupidly shaped and really unusable rooms. The scullery needs new floors ceiling etc anyway. It will upset me to see it go but it will retain my sanity - or what's left of it.) It will be the only non-victorian thing done in the house apart from the electric in 1935 and the 28 year old green bathroom fittings which my ex and I put in.
A structural surveyor has been around (£250 for crossing the threshold) and sent a report with lots of calculations for what needs doing (another £350 thankyou). I haven't got proper scale plans etc from him although I have asked for them. Would a builder be able to do the job from calculations or do I need proper plans? Obviously I want to avoid paying out another £600 and then the cost of plans on top of that.
I'm at a loss here as this is not in my field of experience at all and I can't get heating put in or get rid of the old office cupoards doubling as kitchen units till this is done.
Thankyou for your tolerance.
I have to get the chimney breast between the kitchen and scullery removed (no discussion, it's in the middle and creates two small, stupidly shaped and really unusable rooms. The scullery needs new floors ceiling etc anyway. It will upset me to see it go but it will retain my sanity - or what's left of it.) It will be the only non-victorian thing done in the house apart from the electric in 1935 and the 28 year old green bathroom fittings which my ex and I put in.
A structural surveyor has been around (£250 for crossing the threshold) and sent a report with lots of calculations for what needs doing (another £350 thankyou). I haven't got proper scale plans etc from him although I have asked for them. Would a builder be able to do the job from calculations or do I need proper plans? Obviously I want to avoid paying out another £600 and then the cost of plans on top of that.
I'm at a loss here as this is not in my field of experience at all and I can't get heating put in or get rid of the old office cupoards doubling as kitchen units till this is done.
Thankyou for your tolerance.