jungle_jim01
Member
- Messages
- 189
- Location
- Loftus, North Yorkshire
I had a company in a while ago who recommended a thermocrete lining. The idea was to help reinforce the brickwork which has deteoriated between flues and on the outer wall. I've now repointed the outer wall so hopefully gaps are all closed up again, but looking down the chimney, the brickwork between flues has collapsed slightly and so the flue wall stops approx 75cm from the top of the chimney. I'm thinking that the thermocrete is probably the best option but does anyone know if i'll need to rebuild the flue wall all teh way to the top prior to this?