jocelyn plummer
Member
- Messages
- 2,297
- Location
- North Norfolk
After all this waiting it's all happening at the same time..
Esse arrives on Tuesday,
Aga 6/4 collection one week later
Kitchen floor being self levelled 2 days after
Painter here to do the back windows
Builder here to do the back wall ALL At the same time
Then-- whoo hoo--- the gas man cometh to change our antiquated gas meter ( their decision, not ours).
Tee hee.can't wait, what else will be added in, well the Neighbours start their conversion as well, we all share the same back pathway :roll: :roll: :roll:
Esse arrives on Tuesday,
Aga 6/4 collection one week later
Kitchen floor being self levelled 2 days after
Painter here to do the back windows
Builder here to do the back wall ALL At the same time
Then-- whoo hoo--- the gas man cometh to change our antiquated gas meter ( their decision, not ours).
Tee hee.can't wait, what else will be added in, well the Neighbours start their conversion as well, we all share the same back pathway :roll: :roll: :roll: