Bayliss
Member
- Messages
- 229
- Location
- Bury St Edmunds Suffolk
Stuck between a rock and a damp problem. Mentioned our damp before in here and now decided that we need to rip off all the modern rubbish from the internal wall. My little investigation reveals a layer of gypson plaster over a layer of cement render. Under the cement coat remains what I believe to be daub and I am hoping this can remain in place.
The job is too much for me and wanting a good job done am inviting skilled trades for a quote to hack off/prep'/ and apply lime coats as required. The area amounts to around 30 s/yds or so. If I considered about one hundred pounds a s/yd would that be roughly reasonable? (East Anglia) Thank you for comments and advise.
The job is too much for me and wanting a good job done am inviting skilled trades for a quote to hack off/prep'/ and apply lime coats as required. The area amounts to around 30 s/yds or so. If I considered about one hundred pounds a s/yd would that be roughly reasonable? (East Anglia) Thank you for comments and advise.