I'd welcome some forum input on the subject of blasting.
We have a large building of mostly brick construction (but with one corner in flint where a previous building stood prior to ours being built in 1780).
Unfortunately, the previous owners covered the entire house in Sandtex which is obviously not good for the building and also never had LBC.
Given the size of the property, chemical stripping proved far too expensive, so we have had a few small test sections blasted by a reputable local company who work with E.Heritage and recently were involved in cleaning Blickling Hall nr. Norwich. They tried various substances (calcium carbonate being the softest and most expensive). There was no damage to the facings of the bricks (except 1-2 which are already blown and simply hidden by the Sandtex) or to the flints. It does look as though repointing will be necessary though.
Anyone have experience of blasting? What to look out for etc.?
Finally, would you imagine the CO will request a formal LBC application or is this likely to be a 'no consent required' job? LBC application will push me out apx 10 weeks in my area and therefore too late in the year for repointing with lime....I'd really like to get the work done ASAP, hence prefer 'no consent required'.
Thoughts?
We have a large building of mostly brick construction (but with one corner in flint where a previous building stood prior to ours being built in 1780).
Unfortunately, the previous owners covered the entire house in Sandtex which is obviously not good for the building and also never had LBC.
Given the size of the property, chemical stripping proved far too expensive, so we have had a few small test sections blasted by a reputable local company who work with E.Heritage and recently were involved in cleaning Blickling Hall nr. Norwich. They tried various substances (calcium carbonate being the softest and most expensive). There was no damage to the facings of the bricks (except 1-2 which are already blown and simply hidden by the Sandtex) or to the flints. It does look as though repointing will be necessary though.
Anyone have experience of blasting? What to look out for etc.?
Finally, would you imagine the CO will request a formal LBC application or is this likely to be a 'no consent required' job? LBC application will push me out apx 10 weeks in my area and therefore too late in the year for repointing with lime....I'd really like to get the work done ASAP, hence prefer 'no consent required'.
Thoughts?