plasticpigeon
Member
- Messages
- 2,462
- Location
- Birmingham
The builders who vandalised my house, had a go at rebuilding the brick base to the bay window. It was pretty much falling over as a load of roots from gorse bushes were growing through it, so needed to be done. However it has been built in a very unsightly way so I am planning to do it again. They also had a go at underpinning it by throwing some concrete down a pit below the wall. This has been done in a very slap dash way, in fact only really underpinning the front half of the wall. However the concrete level is too high as it is about level with the ground and I don't want to see the concrete and wanted to put some bedding plants in the and can't. i am definitely going to dig the concrete out next year, but should I fill the void left with compacted soil and build off that as per original construction, or do a proper concrete pour, that offers support to the whole wall? (the wall had foundations of only 2 bricks deep).