I’ve just been mixing up some small quantities sharp sand and powdered hydrated lime (3 to 1) in a bucket in order to relay a few bricks and patch point a few small areas on the internal face of the 9 inch solid brickwork walls of my home. The powdered hydrated lime and sand seemed to mix up fairly well (no lumpy bits) and appears to be setting ok. What would have been the advantages if I had used Lime putty instead of powdered lime?